{"id":32,"date":"2017-02-15T08:24:13","date_gmt":"2017-02-15T08:24:13","guid":{"rendered":"http:\/\/127.0.0.1\/areri\/?page_id=32"},"modified":"2017-06-28T03:53:47","modified_gmt":"2017-06-28T03:53:47","slug":"railway-engineeringcivil-infrastructure","status":"publish","type":"page","link":"https:\/\/areri.aau.edu.et\/index.php\/academics\/railway-engineeringcivil-infrastructure\/","title":{"rendered":"Railway Engineering(Civil Infrastructure)"},"content":{"rendered":"
The program provides opportunities to students to study advanced theory in track system engineering, innovative technology, infrastructure management, maintenance, inspection, tackle\/handle practical railway problems, make innovation by conducting advanced researches.<\/p>\n
The primary objective of the Graduate Program is to provide students with the intellectual depth, breadth, and appropriate knowledge and skill necessary to pursue productive careers in the professions and in the academics. Advanced materials are presented in the form of course work and research to develop the students\u2019 better understanding of, and greater skill in solving railway related problems. The specific objectives of the Railway Engineering program:<\/p>\n
<\/p>\n
Semester I (M.Sc. and M.Eng.)<\/strong><\/p>\n Semester II (M.Sc. and M.Eng.)<\/strong><\/p>\n \u00a0<\/strong><\/p>\n Summer Session or Inter Semester Break or During Thesis Semester (M.Sc.)<\/strong><\/p>\n Semester III (M.Sc. Program)<\/strong><\/p>\n Semester III M.Eng. Program<\/strong><\/p>\n \u00a0<\/em><\/strong><\/p>\n <\/p>\n <\/p>\n","protected":false},"excerpt":{"rendered":" Program Objective The program provides opportunities to students to study advanced theory in track system engineering, innovative technology, infrastructure management, […]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":30,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-32","page","type-page","status-publish","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/areri.aau.edu.et\/index.php\/wp-json\/wp\/v2\/pages\/32"}],"collection":[{"href":"https:\/\/areri.aau.edu.et\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/areri.aau.edu.et\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/areri.aau.edu.et\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/areri.aau.edu.et\/index.php\/wp-json\/wp\/v2\/comments?post=32"}],"version-history":[{"count":12,"href":"https:\/\/areri.aau.edu.et\/index.php\/wp-json\/wp\/v2\/pages\/32\/revisions"}],"predecessor-version":[{"id":619,"href":"https:\/\/areri.aau.edu.et\/index.php\/wp-json\/wp\/v2\/pages\/32\/revisions\/619"}],"up":[{"embeddable":true,"href":"https:\/\/areri.aau.edu.et\/index.php\/wp-json\/wp\/v2\/pages\/30"}],"wp:attachment":[{"href":"https:\/\/areri.aau.edu.et\/index.php\/wp-json\/wp\/v2\/media?parent=32"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}\n\n
\n Crs. Code<\/td>\n Crs. Title<\/td>\n ECTS<\/td>\n Cr.<\/td>\n Lec.<\/td>\n T \/L<\/td>\n<\/tr>\n \n REGM-6001<\/td>\n Mathematical Foundations in Engineering<\/a><\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n 3<\/td>\n<\/tr>\n \n REGM 6101<\/td>\n Railway Geometry and Facilities Design<\/a><\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n 3<\/td>\n<\/tr>\n \n REGM 6106<\/td>\n Applied Hydrology and Drainage<\/a><\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n 3<\/td>\n<\/tr>\n \n REGM 6103<\/td>\n Transportation Soils and Foundation Engineering<\/a><\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n 3<\/td>\n<\/tr>\n \n REGM-6004<\/td>\n Railway Transport Planning and Operations Management<\/a><\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n 3<\/td>\n<\/tr>\n \n Total<\/strong><\/td>\n 35<\/strong><\/td>\n 15<\/strong><\/td>\n 15<\/strong><\/td>\n 15<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n \n\n
\n Crs. Code<\/td>\n Crs. Title<\/td>\n ECTS<\/td>\n Cr.<\/td>\n Lec.<\/td>\n T \/L<\/td>\n<\/tr>\n \n REGM 6102<\/td>\n Railway Track Engineering<\/a><\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n 3<\/td>\n<\/tr>\n \n REGM-6104<\/td>\n Railway Tunneling Engineering<\/a><\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n 3<\/td>\n<\/tr>\n \n REGM-6105<\/td>\n Railway Bridge Engineering<\/a><\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n 3<\/td>\n<\/tr>\n \n REGM-6107<\/td>\n Railway Construction Materials and Equipment<\/a><\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n –<\/strong><\/td>\n<\/tr>\n \n REGM-XXXX<\/td>\n Elective<\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n –<\/strong><\/td>\n<\/tr>\n \n REGM 6007<\/td>\n Professional \u00a0 Practice<\/a><\/td>\n –<\/td>\n –<\/td>\n <\/td>\n \u00a0<\/strong><\/td>\n<\/tr>\n \n Total<\/strong><\/td>\n 35<\/strong><\/td>\n 15<\/strong><\/td>\n 15<\/strong><\/td>\n 9<\/strong><\/td>\n <\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n \n\n
\n Crs. Code<\/td>\n Crs. Title<\/td>\n ECTS<\/td>\n Cr.<\/td>\n Lec.<\/td>\n T \/L<\/td>\n<\/tr>\n \n REGM-7001<\/td>\n Research Methods and Seminar<\/a><\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n –<\/td>\n<\/tr>\n \n Total<\/strong><\/td>\n 7<\/strong><\/td>\n 3<\/strong><\/td>\n 3<\/strong><\/td>\n \u00a0<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n \n\n
\n Crs. Code<\/td>\n Crs. Title<\/td>\n ECTS<\/td>\n Cr.<\/td>\n Lec.<\/td>\n T \/L<\/td>\n<\/tr>\n \n REGM-7002<\/td>\n MSc. Thesis<\/a><\/td>\n 30<\/td>\n 15<\/strong><\/td>\n –<\/strong><\/td>\n –<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n \n\n
\n Crs. Code<\/td>\n Crs. Title<\/td>\n ECTS<\/td>\n Cr.<\/td>\n Lec.<\/td>\n T \/L<\/td>\n<\/tr>\n \n REGM-7003<\/td>\n Project Seminar<\/a><\/td>\n 10<\/td>\n 5<\/td>\n –<\/td>\n –<\/td>\n<\/tr>\n \n REGM-XXXX<\/td>\n Elective<\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n –<\/strong><\/td>\n<\/tr>\n \n REGM-XXXX<\/td>\n Elective<\/td>\n 7<\/td>\n 3<\/td>\n 3<\/td>\n –<\/strong><\/td>\n<\/tr>\n \n Total<\/strong><\/td>\n 24<\/strong><\/td>\n 11<\/strong><\/td>\n 6<\/strong><\/td>\n –<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n