Skip to content

+251111261294

arce@aait.edu.et

ARCE's

  • Home
  • About
    • About ARERC
    • Organization Structure
    • Faculty members
    • Students
  • News
  • Academics
    • Railway Engineering (Civil Infrastructure)
    • Railway System Management
    • Railway Engineering (Traction and Train Control)
    • Rolling Stock Engineering
  • Partnerships
    • South West Jia Tong University
    • Indian Institute of Technology
    • Korean Railway Research Institute
    • Birmingham University
    • Makarare University
  • Announcement
  • Downloads
    • Research
    • Feedback Form
  • Contact Us
  • Home
  • About
    • About ARERC
    • Organization Structure
    • Faculty members
    • Students
  • News
  • Academics
    • Railway Engineering (Civil Infrastructure)
    • Railway System Management
    • Railway Engineering (Traction and Train Control)
    • Rolling Stock Engineering
  • Partnerships
    • South West Jia Tong University
    • Indian Institute of Technology
    • Korean Railway Research Institute
    • Birmingham University
    • Makarare University
  • Announcement
  • Downloads
    • Research
    • Feedback Form
  • Contact Us

Extension of Time for Scholarship Applicant

  1. Home   »  
  2. Extension of Time for Scholarship Applicant

Extension of Time for Scholarship Applicant

October 20, 2022October 24, 2022 areriadminAnnouncement

It is to be recalled that the African Railway Center of Excellent has announced a scholarship for PhD in Railway Engineering & Management and MSc in Railway Engineering, with expected application deadline, 21st October 2022.

However, some of the applicants have been requesting application time extension because of situations related to Grade 12th students’ National Exam. The Center considers the problems and extend application period by one week. Therefore, the application deadline is on 28th October 2022.

PhD in Railway Engineering & Management and MSc in Railway Engineering Scholarship Announcement 2022/23 AY 

Deadline will be on 28th October 2022,

Continue reading

Post navigation

Previous: African Railway Center of Excellence Oct 04/2022 Graduates.
Next: For National MSc in Railway Engineering Applicants, The Shortlisted Applicants will be announced on the coming Tuesday Afternoon (15-Nov-2022).

Upcoming Events

There are no upcoming events at this time.

Links

Budget and Finance

Visitor

  • 2
  • 3,055
  • 88,251

Site Map

Connect with

Proudly powered by WordPress | Theme: goldly by reviewexchanger.